1. PromGidroEnergoMash, Russia;


Crane testing device for cranes of 500t carrying capacity was delivered at the end of 2017.


2. Milan Blagojevich Namenska factory, Lucani, Serbia;


Reconstruction of elevator power train and control system was finalized in January 2018.


3. “Rogun” Hydroelectric power plant, Tajikistan;


Electro-hydraulic systems for movement control of four radial gates and four emergency intake slide gates were delivered in February 2018.


4. “Djerdap” Hydroelectric power plant, Serbia;


Four control units (hydraulic block with electric box placed within protective cabinet) were delivered in February 2018.


5. Krasnodar Reservoir, Russia;


Reconstruction and modernization project for water lock electric and hydraulic system.


EHS for maneuvering of bulkhead gate on the upper head. EHS for maneuvering of working gallery gates and double doors on the lower head of the water lock. Project is to be delivered on March 23, 2018.


6. “Rogun” Hydroelectric power plant, Tajikistan;


Electro-hydraulic system for maneuvering of six basic radial gates of the first and the second construction tunnel. Each gate is actuated using one hydraulic cylinder. Delivery was in 2010. At the moment, works on modernization, adjustments and putting in operation are being performed on three out of six radial gates.


7. “Rogun” Hydroelectric power plant, Tajikistan;


Electro-hydraulic system for maneuvering of six emergency intake slide gates. Delivery was in 2010. At the moment, works on changing operation parameters (increasing the lifting force), adjustments and putting in operation of electro-hydraulic systems are being performed there.


8. “Beloporozhskaya” Hydroelectric power plant is currently under negotiations for the following;


Design and delivery of three radial gates electro-hydraulic maneuvering system. Design specifics are: operation capability EHS at -40 degrees Celsius (heating of hydraulic cylinders and hydraulic piping, gate guidelines and the gate itself).


9. PAO Severstal, Cherepovets, Russia;


One set of machines (coke pusher, coke transfer car, coal charging car) for servicing of coke battery no3. and coal charging car for coke battery no. 4 of the iron and steel works were delivered in 2017.


Factory testing of the eighth coke battery fifth coal charging car of the iron and steel works is expected to be finalized by the end of March 2018.


10. “Drmno” Thermoelectric power plant, TE-KO Kostolac, Serbia


Reconstruction of boiler hydraulic equipment. Equipment is currently being delivered and its installation will be finalized by the end of April 2018.


11. Pigo-r Company, Belgrade, Serbia;


Hydraulic equipment for fruit processing line scissor platform, installation of hydraulic equipment in the premises of the factory is to be finalized by the end of April 2018.